China Supplier Skyward Three Purpose Stringing Block
Main Components
Â
Item No. | Model No. | Applicable Conductor (ACSR) |
Rated Load (KN) |
Weight (kg) |
||
Aluminume Wheel | Nylon Wheel | Aluminum Wheel | Nylon   Wheel | |||
0390 | 0391 | SHCS-2 | ≤240 | 20 | 4.7 | 4.1 |
Cable sheave with hook, cable block and tackle with hook    Â
                            Â
Uses: Apply to conductor paying off on straight line, left or right side corner pole.Â
Â
Description of Cable pulley :
a. We manufacture a lot of models for different uses in the overhead transmission line construction.
b. They have are used to support conductors,OPGW,ADSS, communicatio lines.
c. The sheave of the pulley blocks are made from higth strength nylon,or aluminum materials ,and the frame of blocks are made of galvanized steel.The lateral ones are mounted on ball bearings.
Remarks:All kinds of pulley blocks can be manufactured according to the customers's requirements.
If any interested,please feel free to contact with us for more information,and we will try our best to comply with your requirements.
Â
Packing&Delivery Time
1. Bulk Pack With Wooden Board Carton
2. Delivery time:Â Within 30 Days After Receiving The Payment
Â
Â
Main Components
Â
Item No. | Model No. | Applicable Conductor (ACSR) |
Rated Load (KN) |
Weight (kg) |
||
Aluminume Wheel | Nylon Wheel | Aluminum Wheel | Nylon   Wheel | |||
0390 | 0391 | SHCS-2 | ≤240 | 20 | 4.7 | 4.1 |
Cable sheave with hook, cable block and tackle with hook    Â
                            Â
Uses: Apply to conductor paying off on straight line, left or right side corner pole.Â
Â
Description of Cable pulley :
a. We manufacture a lot of models for different uses in the overhead transmission line construction.
b. They have are used to support conductors,OPGW,ADSS, communicatio lines.
c. The sheave of the pulley blocks are made from higth strength nylon,or aluminum materials ,and the frame of blocks are made of galvanized steel.The lateral ones are mounted on ball bearings.
Remarks:All kinds of pulley blocks can be manufactured according to the customers's requirements.
If any interested,please feel free to contact with us for more information,and we will try our best to comply with your requirements.
Â
Packing&Delivery Time
1. Bulk Pack With Wooden Board Carton
2. Delivery time:Â Within 30 Days After Receiving The Payment
Â
Â
Since the growth of sugarcane has certain requirements on plant spacing, row spacing and planting depth, it requires a lot of manpower and time, but one machine can bear the workload of several or even dozens or even hundreds of people. Compared with manual production, using machinery for production can complete more work in a shorter time, greatly save the time required for each link of sugarcane manufacturing, and reduce the cost consumption in the sugarcane manufacturing process.
The Self-propelled automatic sugarcane harvester specially developed by TAGRM can automatically cutting the sugarcane and even fallen, which greatly accelerates the efficiency of sugarcane harvesting.
Sugarcane Harvester,Sugarcane Cutting Machine,Sugar Cane Harvester,Sugar Cane Harvester Parts
NANNING TAGRM CO.,LTD , https://www.tagrmfarming.com