Sewage discharge fee implementation in Shandong Province

It was learned from the Shandong Provincial Environmental Protection Bureau that since April 1st, the sewage charges must all be collected and put into storage by the non-tax revenue collection and management system of Shandong Province, and the ticket separation system shall be fully implemented. It is forbidden to set up an interim account for sewage charges without authorization, and it is forbidden to pay sewage charges outside the system through non-taxpayers.

The province requires that the income from sewage charges in all cities should be incorporated into the budget management. At the same time, according to the financial situation and the needs of the environmental protection agencies, the personnel of the environmental protection agencies, public funds, supervision and law enforcement funds, purchase of equipment and infrastructure, and operating funds All of them are included in the financial budget of the same level to be guaranteed in full, and the phenomenon of misappropriation and embezzlement of sewage charges is effectively eliminated from the source.

Transmission Parts

This classification mainly includes the aluminum alloy die casting transmission parts using in Auto area,the raw material is aluminum alloy.
In the die casting process,higher specific pressure is required, so that higher filling speed can be obtained.which is beneficial for alloy to overcome mold filling resistance.and effectively fill each part of the cavity.The Casting General Tolerance is Grade GB-CT4.
Process Technology: High pressure die casting, Cold Chamber
Product Dimensions: Customized
Casting General Tolerance: Grade GB-CT4
Flow Processes: Die casting, Degating to remove the residual of the gate, Polishing and Deburring to remove the burrs, Polishing to remove the parting line, flash,CNC Turning, Cleaning, Packaging, Storaging, Shipping
Control Measure: Incoming Material Test, First Article inspection, Routing inspection, Final item inspection, and Outgoing quality control
Inspection Equipment: CMM, Caliper, Plug Gage, Screw Gauge
Application: Auto Parts
Certificate: IATF16949:2016,ISO14001:2015,ISO45001:2018
Lead Time: 30-35 days
Trade Term: FOB Ningbo

Aluminum Transmission Parts,Die Casting Transmission Parts,Auto Transmission Parts,Malaysia Casting Transmission Parts

NINGBO ZHENHAI BOLANG METAL PRODUCTS FACTORY , https://www.casting-part.com