500L Copper Brewery Equipment/Draft Beer Machinery
DEGONG-500L copper brewery equipment/draft beer machinery
Â
--Company profile
Â
Jinan Degong Equipment Technology Co., Ltd is the a professional beer equipment and brewing technology supplier, who can professionally design, research and develop, and manufacture the brewing equipment. we can provide clients one-stop service from design, layout, to finished products. Its main business includes beer equipment, self brewing equipment, hotel beer equipment, draft beer dispenser, school laboratory equipment, etc. We mainly provide the capacity 100L/D, 200L/D, 300L/D, 500L/D, 1000L/D, 2000L/D, etc.
Â
We also manufacture all other stainless steel types and sizes of fermenting and storage tanks.Â
The inner of the fermentation tank are adopted 304 stainless steel. Use polyurethane as insulating layer.Â
The outside scarfskin is according to the customers' requirement.Â
You can choice stainless steel polishes, carbon steel, spray finishing and so on.Â
Adopted the international standards of fermentation technology, diverse methods to control the temperature,Â
the inner surface of the tank are mirrorpolished.Â
Completely meet the demanding of PLC and sterilize system.Â
The cooling jacket can achieve all countries standard, supply Miller, arch, corrugated plate and so on toÂ
meet all kinds of cooling technology of coolant and pressure.
Â
Quality: CE2000 and ISO9001.
Â
Â
--brewery process for your reference
Â
Â
Â
Detail information of beer brewing equipment
Â
--Milling system
01. mill machine(1 pc): Breaker roll type, adjustable mill degree.
 Â
--Mashing system
01. components: mash&lauter tank, boiling and whirlpol tank, mill machine, wort pump, plate heat exchanger, saccharification combination pipeline, pipeline & valve VLV, wort measuring meter, venturi tubes, measuring cylnder, titanium rod, rake and operation platform.
02. Material: Inner(SUS304), thickness: 3.0mm;
03. External-Jacket (stainless stell), thickness: 1.5mm.
04. Cylinder(sharp type, SUS), thickness: 2.0mm;
05. Inner surface teatment: welds grinded to Ra0.6um;
06. Insulation: Polyurethane-thickness 80mm.
07. Adding: Blender.
 Â
--fermentation system
01.components: fermentation tank, bright beer tank, yeast adding tank, food tube, refrigerant pipelines(keep warm tube), electrionic gauges, valve pipe fittings, electromagnetic put air out.
02. Material: Inner(SUS304)thickness: 3.0mm;
03. External-Jacket(SUS304)thickness: 1.5mm
04. Oval hea cone bottom, thickness; 2.0 mm;
05. Inner surface treatment: welds grinded to Ra 0.4um(attached Omni cleaning ball);
06. Mirror surface finish inside.
Â
Â
--Cooling System
01. components: ice water tank, refrigerating unit, circulate pump, pipeline&valves;
02. Material: Inner(SUS304), thickness: 2.5mm;
03. External-Jacket(stainless steel);
04. Insulation: Polyurethane-thickness 80mm;
05. Refrigerating unit, capacity: 9000 kilocalorie; medium: Freon 22; working voltage: 380v; Power: 2.5kw;
06. Circulate pump, flow: 3 sq.m/h; lift: 20m; power: 0.15kw;
07. Pipeline & valves: Include valves and pipeline.Â
Â
--Control System
01. Mashing control: mixing, rotation, wort pump;
02. Fermenting control: temperature, pressure, lamp;
03. Cooling control: machine unit, pump, temperature;
04. Cleaning control: cleaning pump.
05. Manual operate, Instrument, Semi-Auto-control, SS jacket
 Â
--Cleaning System
01. washing pump: 1000l/h, SS anticorrosion pump. Lift: 18m. Rev: 2880 r/min.
02. alkali tank, capacity: 50L;
03. Sterilization tank, capacity: 50L;
04. Stainless steel, thickness: 2mm;
05. Inner surface treatment; welds grinded to Ra 0.6umÂ
Â
--Beer-Selling System(optional, mainly for hotel)
01.beer-selling machine of bar counter: 4 nozzles, 1 pc;
02. Material: red copper, titanium valves inner surface, treatment: weld grinded to Ra 0.6um.
Â
Trade terms and sale service
Â
1. Providing beer product technology, brewing formular, personnel training service, installation and debugging,
2. 36 months warranty, all life service.
3. Offer validity: the offer will be valid in 25 days.
4. Trade terms: FOB/CIF/CFR.
5. Payment terms: T/T, Moneygram.
6. Stock up period: within 35 days based on the capacity of equipment.
7. Condition of payment: 30%, advance payment after signing the contract; 70%, after preparation of the equipment for shipment/3 days before shipment.
copper fittings approved WRAS,DVGW,SABSS,UPC,NSF61,covered EN1254-1 and ASME B16.22,copper fittings,copper pipe fittings,copper plumbing fittings,copper capillary fittings,copper pressure fittings
copper fittings,copper pipe fittings,copper plumbing fittings,copper capillary fittings,copper pressure fittings
Taizhou Runde Company , https://www.zjbronzefittings.com