List of equipment required for 500 tons/day iron ore plant
List of equipment required for 500 tons/day iron ore plant
Device name | Specification model | Quantity (station) | Power (kW) | Remarks |
Trough feeder | 980×1240 | 1 | 7.5 | |
Jaw Crusher | PE400×600 | 1 | 30 | Cast steel frame |
Jaw crusher | PEX250×1000 | 2 | 37 | Cast steel frame |
Pendulum feeder | 600×600 | 1 | 2.2 | |
Straight ball mill | GM2.1×4.0 | 1 | 245 | |
Sorghum classifier | FLG-2000 | 1 | 18.5 | Extended type with sand scraper |
Magnetic separator | CTB900×1800 | 1 | 4 | Magnetic induction 2500 Gauss |
Magnetic separator | CTB750×1800 | 2 | 3 | Magnetic induction strength 1400 ~ 1800 Gauss |
Wuan Jianfeng Casting Co., Ltd. , https://www.hbjfcasting.com