The daily system that should be established for production scheduling

Beneficiation plant production scheduling for the good work, should establish the following daily work system:
1. Day and night duty system: The production of the concentrator is highly continuous. The dispatcher must implement the duty system of three shifts around the clock, so that the production and control are continuous 24 hours a day, and the whole process of production is inspected, supervised and dispatched. The duty officer shall record the problems found on the shift, the measures taken and the results of the execution on the dispatch diary;
2. Reporting system: The dispatching personnel at all levels should make the first day's production into a situation every day from 8 to 10 o'clock, report to the superior dispatching department and the production responsible person of the factory, and be responsible for compiling the mineral processing production daily report;
3. Dispatching conference system: The concentrating plant usually holds a regular meeting every week. The directors of the basic workshops and auxiliary workshops of the whole factory and the heads of the various departments must participate. The meeting mainly ensures the coordination of the work of each department in each production process. , production in harmony according to the job planning tasks.

China leading manufacturers and suppliers of Steel Nut,Wing Nut, and we are specialize in Din Astm Nut,Steel Juk Nut, etc.

Steel Nut,Wing Nut,Din Astm Nut,Steel Juk Nut

China Steel Nut,Wing Nut,Din Astm Nut Manufacturer

Wing Nut

Steel Nut,Wing Nut,Din Astm Nut,Steel Juk Nut

Hebei Qierjie New Energy Technology co., Ltd , https://www.qejfastener.com